Running an Extraction Facility

Preventive Maintenance Plans for a Closed Loop Lab

Daily, weekly, monthly and quarterly maintenance checklists for recovery pumps, chillers, vacuum pumps and ovens, seals, filters, sensors and hoses.

Educational overview from my experience, not legal or operating instructions. Example numbers are marked as examples. No solvent procedures, temperatures or pressures are given. Always follow your state cannabis regulations, local fire code, equipment manufacturer guidance and your own approved SOPs.

Most downtime I've seen in extraction labs traces back to small things nobody checked: a tired gasket, a clogged filter, a sensor out of calibration. A written preventive maintenance (PM) plan turns those into routine tasks instead of emergencies.

Build the plan around your equipment list

Start with an asset register: every piece of sub-equipment, its serial number, manufacturer manual, service intervals and who owns it. Then turn manufacturer intervals into a calendar. Where a manual is stricter than this page, the manual wins.

Example PM checklist

EquipmentDailyWeeklyMonthlyQuarterly
Recovery pumpsVisual check for leaks, unusual noise, logged run hoursInspect inlet filters/strainersCheck fittings and mounts; review run-hour trendService per manufacturer (seals/rebuild kit as scheduled)
ChillersConfirm setpoint reached and alarms clearCheck fluid level and conditionClean condenser coils/filtersFluid replacement and full service per manual
Vacuum pumps & ovensConfirm gauges read normally; log any driftCheck oil level/condition (oil pumps)Oil change per hours used; inspect door gasketsCalibrate gauges and temperature controllers
Seals & gasketsInspect any seal opened that daySpot-check clamp connectionsReplace worn or deformed gaskets from stockFull seal audit across the system
Filters & mediaReplace single-use filters per SOPCheck housings for damageReview filter usage vs productionAudit filter spec and supplier
Sensors & gas detectionConfirm detectors powered and alarm-freeBump test per manufacturerReview alarm logsCalibration by qualified provider
Hoses & linesLook for kinks, abrasion, discolorationCheck fitting tightness and labelsInspect against rated life/date codesReplace on schedule or when in doubt

Example intervals only. Use your manufacturer's and engineer's schedule.

Fix in house when you can

Many failures on chillers, recovery pumps and compressors, heaters and water pumps are mechanical and diagnosable on site. I diagnose and repair most of these issues in house, and call the manufacturer or a licensed technician when a repair needs certification (for example refrigerant work) or is under warranty.

Keep records an inspector can follow

Every PM task should leave a trace: date, initials, what was found, parts used. A simple logbook or CMMS works as long as it is consistent. Tie repairs to work orders, and track parts used so your spare-parts stock stays honest.

Spare parts that save the day

  • Gaskets and seals in every size you run
  • Filters and filter media
  • Pump rebuild kits and vacuum pump oil
  • Spare sensors or a loaner plan with your calibration vendor
  • Common fittings and clamps

Questions

How often should a closed loop system be maintained?

Follow the manufacturer and engineer schedule, then add daily visual checks and logged weekly, monthly and quarterly tasks. High-volume labs often need tighter intervals.

What fails most often?

In my experience: seals and gaskets, filters, and pumps that miss scheduled service. Those are cheap to stock and easy to schedule.

Want a second set of eyes?

I run workflow audits and GMP mock audits for licensed labs.

← Running an Extraction Facility

Ready when you areGet a closed loop expert in your lab

Setup, repairs, upgrades, diamond programs or a GMP mock audit. I travel and live on site at licensed facilities.

Book a consult